Laying an undersea cable starts years before the ship sails. A route is chosen on paper, surveyed on the seabed, built in a factory, landed by hand in the shallows, and only then paid out from a ship and buried where fishing and anchoring make that necessary.
From the book The Submarine CableChapters 16 and 25. Read the full book free as a PDF.
Choosing a route on paper
KIS-ORCA, a cable-protection organisation, says the process starts with a desk-top study that identifies a route and its risks. It considers landing points, territorial waters and exclusive economic zones, and whether landings can be made directly. Permits come from government administrations and other seabed users such as fisheries, cable owners and pipeline owners.
The route survey
A survey ship then checks the route. It collects bathymetry, geotechnical, sub-bottom and side-scan data to support route engineering, cable selection and burial. A final route is chosen as the safest and most economical, hazards found are avoided, and the types of cable to use are confirmed. Seabed conditions are also assessed where the cable is to be buried.
The shore end
When the route is set, the cable is made and loaded on the cable ship. At the shore approaches, burial in shallow water is done by divers. If the water is too shallow for the main ship to approach safely, a smaller shallow-draft vessel may lay the shore end. This has an old precedent. The 1871 photograph of the landing of the submarine telegraph cable at Port Darwin shows a crowd gathered on the beach as the cable comes ashore.

The main lay and the plough
The cable ship lays the rest of the system. Where fishing and anchoring are risks, KIS-ORCA says the cable is generally buried to a target depth of about 1 metre. NTT World Engineering Marine gives burial depths of 0.6 to 2.0 metres: 1.5 to 2.0 metres at 100 to 150 metres water depth, where large ships anchor, and 0.6 to 1.0 metre down to about 1,000 metres, where trawling is the main hazard. A plough towed behind the ship buries the cable as it is laid.

The ICPC notes that, until recently, ploughs would not work in depths greater than 1,000 metres, and that some can now bury cable down to 1,500 metres. Most cables below 1,000 metres have not been buried. Where the seabed is too hard, rough or steep for a plough, the cable may be laid on top and an ROV, a remotely operated vehicle, comes later to bury it.
Slack, not tension
Installers set enough slack to follow the major seabed features, but not too much, particularly in armoured cable. According to the ICPC, armoured cable has inherent torsion that can cause loops or kinks if laid with no tension.
Where it goes next
A laid cable does not stay safe by default. The next article, why undersea cables break, covers what the burial is for. For what is inside the cable being laid, see how undersea internet cables work.
Quick answers
How are undersea cables laid?
A route is chosen and permitted, surveyed, and the cable is made and loaded on a cable ship. The shore end is landed in shallow water, then the ship pays out the main cable and a plough buries it where risks from fishing and anchors are high.
How deep are undersea cables buried?
KIS-ORCA gives a target of about 1 metre where fishing and anchoring are risks. NTT World Engineering Marine gives 0.6 to 2.0 metres depending on water depth and the hazard.
Are all undersea cables buried?
No. The ICPC says most cables below 1,000 metres have not been buried, and deep-water cables often lie on the seabed.